Home

Estimate trust layer

The number stays attached to the room plan

The estimate layer is included to show decision value: comparing room ideas before money is committed. TarePlan works best when the cost range is read beside the visual scope, assumptions, warnings, and likely handoff steps.

Important estimate disclaimer

TarePlan estimates are early planning ranges. They are not contractor quotes, appraisals, inspections, engineering guidance, code guidance, permit guidance, or guaranteed prices.

Visual scope first

Costs are tied to what is actually placed in the room: walls, openings, furniture, rugs, plumbing objects, and finishes.

Materials

Mock national averages currently power walls, openings, furniture, rugs, plumbing objects, and surface finishes.

Labor

Early labor assumptions split from materials so contractor rate cards and ZIP multipliers can replace them over time.

Change cost

Mark existing creates a baseline, then TarePlan emphasizes the estimated cost of what changed.

Confidence

Ranges are intentionally broad because the current prototype does not inspect real site conditions, local code, or hidden damage.

Before spending money

Use estimates to compare ideas, not to approve a construction budget.
Keep the visual scope, measurements, and assumptions attached to the number.
Confirm measurements, materials, permits, and feasibility with qualified professionals.
Expect local labor, access, hidden damage, availability, and scope changes to move the number.
Treat contractor bids and product quotes as the source of truth before spending money.
Do not use early planning ranges for code, permit, structural, electrical, or plumbing approvals.

Product direction

The goal is to make uncertainty smaller before money is spent. Planned versions can connect visual change plans to ZIP aware pricing data, real product catalogs, contractor reviewed scopes, investor scenarios, and clearer confidence labels.